From Monday 21st July for approximately 43 days, works at Whitchurch Square will require scaffolding to be erected. During this period both London Road and Newbury Street will be made one-way only towards the Square. As a result buses on service 76 towards Overton and Basingstoke and service 86 towards Oakley will need to divert along Bell Street, past the railway station and through Lynch Hill park to re-join the B3400 at the Gables. During this period bus stops on London Road will not be served towards Basingstoke. Buses towards Andover and Winchester will be able to run as usual. |